99亚洲精品,一本大道久久东京热无码,九九久久精品国产av片国产 ,亚洲国产福利

Online Service
Scan it
Support hotline
18681482740
Service Hotline:
18681482740
中文  |   English
Industry knowledge
Contact

Address: Floor 1, Building 2, Quanshengchang Industrial Park, Buyong Shajing Road, Shajing Street, Shenzhen

Contact: Mr. Li 18681482740

Email: lilinhan1314@126.com

Website:

Industry knowledge
Assembly of upper mold seat for precision stamping molds
07-19 / 2024

In order to shorten the processing cycle of stamping molds, enhance mold accuracy, unify the methods of operators, reduce anomalies that may occur during mold production, ensure production quality and mold life, the following explanation is given to the assembly process of the upper mold seat of the stamping mold.




The assembly of the upper die seat of the stamping mold is completed in the following 10 steps:




1. Splint Φ 12.000 positioning holes and auxiliary guide pillar holes, with a circumferential chamfer of R1.0 and polished




2. Use a 600 # oilstone or diamond file to remove burrs from the frame opening.




3. Use 600 #~1000 # oilstones to flatten both sides of the template and remove any burrs.




4. Use kerosene and alcohol to clean the mold surface and inner holes.




5. Install the auxiliary guide set into the same template.




6. Place the clamping part of the punch into the template frame and check if the punch is smoothly removed and placed. (Do not put the punch in after it is closed to avoid accidentally breaking the small punch)




7. Fix the punch with a pressure plate. (Note that the pressure plate should not be too close to the punch to avoid interference with the punch.) After fixing the punch, there should be a small amount of movement space to facilitate the natural alignment of the punch.




8. Gently close the detachment plate and the detachment back plate together into the clamp plate, and check if there is any interference in the positioning of the detachment back plate's pressing plate. When fully closed, there should be no gap between the detachment back plate and the clamp plate.




9. After joining, the cutting punch should exceed the pressing surface by more than 0.8mm (minus material thickness).




10. Insert the adjustment rod and upper mold adjustment punch, and rotate the screw until the adjustment punch approaches the effective height.






Through the above 10 steps, the assembly of the upper mold seat of the stamping mold has been completed.






Licao Precision is an ODM/OEM professional manufacturer specializing in the design and manufacturing of precision stamping molds and precision hardware stamping.


Links:Zibo CNC machine tool automatic car washing machine Qingdao refrigeration equipment grinder equipment steel grit fire inspection cabinet sweeper motor desulfurization denitrification equipment drawing mold washing machine automatic soldering machine server repair HART475 hand operator dust-free cloth dust-free paper stack screw type Sludge dehydration machine, precision repair welding machine, Shandong motor repair, rotary hot pot equipment, integrated ultrasonic cleaning machine, Zhongjie radial drilling machine, beer equipment, Shenzhen brass manufacturer, welcome lamp, lens digging, drilling rig, aluminum housing manufacturer, automatic dispensing machine, automatic screwing machine neodymium Iron boron magnet 4g router wireless bridge
We provide you with high quality products
在线电影av| 一本a新久道| 欧美日韩久久中文字幕| 免费无码精品黄AV电影| 亚洲色偷偷色噜噜狠狠99网| 亚洲欧美中文日韩在线v日本| 亚洲AV无码潮喷在线观看| 高清无码一区二区在线观看吞精| 亚洲av无码一区二区二三区我| AV中文字幕一区人妻| 国产三区在线成人AV| 999AV| 亚洲欧美国产精品久久| 国产成人无码AV片在线观看不卡| 亚洲国产成在人网站天堂| 久久久精品国产免大香伊| 国产综合内射日韩久| 国产成人AV电影在线观看第一页| 久久久国产乱子伦精品作者| 国产无遮挡又黄又爽在线视频| 在线精品亚洲一区二区动态图| 视频一区二区三区欧美| 欧美A级成人网站免费| 国产精品内射久久久久欢欢 | 中文字幕日韩一区二区不卡| 樱桃视频 大全免费观看| 91国内产香蕉| 五月综合久久| 成人午夜在线| 国产精品婷婷| 神马午夜久久| 天堂中文最新版在线官网在线| 4虎影视| 亚洲天堂一区| 熟妇人妻不卡中文字幕| 久久无码人妻影院| 欧美成人精品 一区二区三区| 两个人免费观看日本的完整版| 伊人色综合视频一区二区三区| 亚洲国产精品无码中文字满| 久久精品女人的天堂av|