99亚洲精品,一本大道久久东京热无码,九九久久精品国产av片国产 ,亚洲国产福利

Online Service
Scan it
Support hotline
18681482740
Service Hotline:
18681482740
中文  |   English
Industry knowledge
Contact

Address: Floor 1, Building 2, Quanshengchang Industrial Park, Buyong Shajing Road, Shajing Street, Shenzhen

Contact: Mr. Li 18681482740

Email: lilinhan1314@126.com

Website:

Industry knowledge
Assembly of upper mold seat for precision stamping molds
07-19 / 2024

In order to shorten the processing cycle of stamping molds, enhance mold accuracy, unify the methods of operators, reduce anomalies that may occur during mold production, ensure production quality and mold life, the following explanation is given to the assembly process of the upper mold seat of the stamping mold.




The assembly of the upper die seat of the stamping mold is completed in the following 10 steps:




1. Splint Φ 12.000 positioning holes and auxiliary guide pillar holes, with a circumferential chamfer of R1.0 and polished




2. Use a 600 # oilstone or diamond file to remove burrs from the frame opening.




3. Use 600 #~1000 # oilstones to flatten both sides of the template and remove any burrs.




4. Use kerosene and alcohol to clean the mold surface and inner holes.




5. Install the auxiliary guide set into the same template.




6. Place the clamping part of the punch into the template frame and check if the punch is smoothly removed and placed. (Do not put the punch in after it is closed to avoid accidentally breaking the small punch)




7. Fix the punch with a pressure plate. (Note that the pressure plate should not be too close to the punch to avoid interference with the punch.) After fixing the punch, there should be a small amount of movement space to facilitate the natural alignment of the punch.




8. Gently close the detachment plate and the detachment back plate together into the clamp plate, and check if there is any interference in the positioning of the detachment back plate's pressing plate. When fully closed, there should be no gap between the detachment back plate and the clamp plate.




9. After joining, the cutting punch should exceed the pressing surface by more than 0.8mm (minus material thickness).




10. Insert the adjustment rod and upper mold adjustment punch, and rotate the screw until the adjustment punch approaches the effective height.






Through the above 10 steps, the assembly of the upper mold seat of the stamping mold has been completed.






Licao Precision is an ODM/OEM professional manufacturer specializing in the design and manufacturing of precision stamping molds and precision hardware stamping.


Links:Zibo CNC machine tool automatic car washing machine Qingdao refrigeration equipment grinder equipment steel grit fire inspection cabinet sweeper motor desulfurization denitrification equipment drawing mold washing machine automatic soldering machine server repair HART475 hand operator dust-free cloth dust-free paper stack screw type Sludge dehydration machine, precision repair welding machine, Shandong motor repair, rotary hot pot equipment, integrated ultrasonic cleaning machine, Zhongjie radial drilling machine, beer equipment, Shenzhen brass manufacturer, welcome lamp, lens digging, drilling rig, aluminum housing manufacturer, automatic dispensing machine, automatic screwing machine neodymium Iron boron magnet 4g router wireless bridge
We provide you with high quality products
国产精品久久久久精品香蕉| 午夜福利网| 亚洲av无码专区亚洲av桃花岛| 欧美国产成人精品二区| 国产三级a| 精品在线一区| 99无码精品二区在线视频| 丰满人妻熟妇乱又仑精品| 国产精品久久香蕉免费播放| 国产精品cum4k玩弄人妻| 69亚洲精品| 久久精精品久久久久噜噜| 超碰在线91| 欧美激情网址| 国产精品久久久电影院三级| 99久久综合狠狠综合久久止| 亚洲熟妇久久精品| 亚洲精品国产精品乱码不卞2021| 你懂的网址在线| 久久久国产一区| 国产日本在线| 亚洲色图网址| 依依成人精品视频在线观看| 国产AV无码专区亚洲精品 | 717理论片午影院无码| 舞阳县| 色性av| 91精品国产色综合久久不卡蜜臀 | 久久久久久久久蜜桃| 四虎成人久久精品无码| 柳河县| 亚洲av日韩av天堂无码 | 精品国产三级AV一区二区三区| 国精品人妻无码一区二区三区性色| 国产精品无码一区二区三级| 涞源县| 香港三级日本三级A视频 | 色欲人妻AAAAAAA无码| 成人免费ā片在线观看| 女人爽到高潮的免费视频| 亚洲综合在线一区二区三区 |