99亚洲精品,一本大道久久东京热无码,九九久久精品国产av片国产 ,亚洲国产福利

Online Service
Scan it
Support hotline
18681482740
Service Hotline:
18681482740
中文  |   English
Industry knowledge
Contact

Address: Floor 1, Building 2, Quanshengchang Industrial Park, Buyong Shajing Road, Shajing Street, Shenzhen

Contact: Mr. Li 18681482740

Email: lilinhan1314@126.com

Website:

Industry knowledge
Assembly of upper mold seat for precision stamping molds
07-19 / 2024

In order to shorten the processing cycle of stamping molds, enhance mold accuracy, unify the methods of operators, reduce anomalies that may occur during mold production, ensure production quality and mold life, the following explanation is given to the assembly process of the upper mold seat of the stamping mold.




The assembly of the upper die seat of the stamping mold is completed in the following 10 steps:




1. Splint Φ 12.000 positioning holes and auxiliary guide pillar holes, with a circumferential chamfer of R1.0 and polished




2. Use a 600 # oilstone or diamond file to remove burrs from the frame opening.




3. Use 600 #~1000 # oilstones to flatten both sides of the template and remove any burrs.




4. Use kerosene and alcohol to clean the mold surface and inner holes.




5. Install the auxiliary guide set into the same template.




6. Place the clamping part of the punch into the template frame and check if the punch is smoothly removed and placed. (Do not put the punch in after it is closed to avoid accidentally breaking the small punch)




7. Fix the punch with a pressure plate. (Note that the pressure plate should not be too close to the punch to avoid interference with the punch.) After fixing the punch, there should be a small amount of movement space to facilitate the natural alignment of the punch.




8. Gently close the detachment plate and the detachment back plate together into the clamp plate, and check if there is any interference in the positioning of the detachment back plate's pressing plate. When fully closed, there should be no gap between the detachment back plate and the clamp plate.




9. After joining, the cutting punch should exceed the pressing surface by more than 0.8mm (minus material thickness).




10. Insert the adjustment rod and upper mold adjustment punch, and rotate the screw until the adjustment punch approaches the effective height.






Through the above 10 steps, the assembly of the upper mold seat of the stamping mold has been completed.






Licao Precision is an ODM/OEM professional manufacturer specializing in the design and manufacturing of precision stamping molds and precision hardware stamping.


Links:Zibo CNC machine tool automatic car washing machine Qingdao refrigeration equipment grinder equipment steel grit fire inspection cabinet sweeper motor desulfurization denitrification equipment drawing mold washing machine automatic soldering machine server repair HART475 hand operator dust-free cloth dust-free paper stack screw type Sludge dehydration machine, precision repair welding machine, Shandong motor repair, rotary hot pot equipment, integrated ultrasonic cleaning machine, Zhongjie radial drilling machine, beer equipment, Shenzhen brass manufacturer, welcome lamp, lens digging, drilling rig, aluminum housing manufacturer, automatic dispensing machine, automatic screwing machine neodymium Iron boron magnet 4g router wireless bridge
We provide you with high quality products
国产91精品一区二区麻豆亚洲| 久久狠狠色噜噜狠狠狠狠97 | 久久亚洲AV无码精品色午夜| 印度毛茸茸BBBBXXXX| 少妇专区| 亚洲国产一区二区a毛片| 337p日本欧洲亚洲大胆裸体艺术| 97精品久久天干天天天按摩 | 中文字幕乱码中文乱码777| 好爽毛片一区二区三区四| 亚洲精品无码久久久久AV麻豆 | 国产特级毛片AAAAAA高潮流水 | 伊人超碰在线| 人妻精品动漫H无码专区| 一本一道精品欧美中文字幕| 国产成人精品亚洲日本语言| 国产在线精品无码二区二区| poronodrome另类极品| 日韩激情久久| 青青久| 亚洲精品夜夜夜| 亚洲码欧美码一区二区三区| 欧美成人一区二区三区在线观看| 日韩在线观看视频| 精品亚洲一区二区三区在线观看 | 丰满人妻被黑人全部进入| 涪风论坛| 午夜精品久久久久久久99热黄桃 | 人妻中文字幕无码系列| 啪啪啪啪网站| 国产福利91精品| 制服丝袜一区二区三区| 黄色大片一级片| 国产精品一区二区久久不卡| 免费a级毛片av无码| 人妻丰满熟妇av无码区| 亚洲乱码一区二区三区在线观看 | 91色| 耄耋老太性太乱| 一区二区日本| av免费|